Power distribution, backup power, cooling and industrial software; Euronext Paris: SU, US ADR SBGSY. Q3 revenue a record $12.7B (+16.9% organic); data-center demand up triple digits; 2026 targets raised; $22.6B PTC deal pending. Updated Nov 14, 2026. 8 pages.
Deeper than Bloomberg. Earlier than Wall Street.
The full Schneider Electric brief is free. Enter your name and email and we'll send your PDF in minutes.
No spam. Unsubscribe anytime.
By George Brust, President & CEO, Olympus Services · Published 14 Nov 2026
The Schneider Electric brief below is the full Olympus research text, with every figure tagged to a numbered source. A formatted PDF of the same brief is free by email.
| Date | Event |
|---|---|
| Nov 2025 | Signs $1.9B and $373M supply-capacity agreements with Switch and Digital Realty [S1][S2] |
| 26 Feb 2026 | FY2025: revenue passes EUR 40B; record free cash flow [S3] |
| 6 Apr 2026 | Nathan Fast becomes CFO; Hilary Maxson leaves for Oracle [S4][S5] |
| 30 Jun 2026 | Agrees to buy Cognite, an industrial data and AI software company, for $3.1B [S6][S7] |
| 30 Jul 2026 | H1: record revenue, margin and free cash flow; targets raised [S8] |
| 5 Oct 2026 | Agrees to buy PTC, a US design-software company, for about $22.6B [S9][S10] |
| 16 Oct 2026 | Q3 revenue a record EUR 11.46B (+16.9% organic); 2026 targets raised again [S9] |
| 18 Feb 2027 | Full-year 2026 results [S9] |
This brief is one of a group on the companies that supply power equipment to AI data centers, alongside Siemens, ABB, Eaton and Powell. Schneider reports revenue each quarter but profit only each half year, so this brief combines third-quarter revenue (16 October) with first-half profit (30 July).
Schneider Electric SE is based in Rueil-Malmaison, France. Olivier Blum is chief executive and Nathan Fast chief financial officer. It has two businesses: Energy Management, about 84% of third-quarter revenue, and Industrial Automation, about 16%, which includes the AVEVA software business (Olympus arithmetic). [S9][S4]
Third-quarter revenue rose 16.9% organically, and 17.9% as reported, to a record EUR 11.46 billion ($12.7 billion), ahead of the analyst average of about EUR 11.14 billion. North America grew 19.9% and China and East Asia 26.1%. Demand from data centers and networks grew at a triple-digit rate. [S9][S10]
In the first half, adjusted earnings before interest, tax and amortization of acquired intangibles (adjusted EBITA) rose 22% organically to EUR 4.09 billion, a 19.3% margin; net income rose 30% to EUR 2.49 billion; and free cash flow rose to EUR 1.63 billion from EUR 0.47 billion. [S8]
Schneider now targets 2026 organic revenue growth of 12–14% and organic adjusted EBITA growth of 18–21%, with the margin up 1.0–1.2 points. [S9]
Conviction set at IV (High). Schneider sells much of what goes into a data center's power and cooling system, demand there is growing at triple digits, revenue growth has accelerated to 17%, margins are rising and it has raised its targets twice this year. Against that, the $22.6B PTC purchase must be approved and integrated, the shares trade at about 28 times 2025 adjusted earnings per share (Olympus arithmetic), and data centers are a growing share of demand that could slow.
Every AI rack needs power in, backup behind it and heat out. Schneider sells all three.
Olympus Services view
What it provides: hardware, software and services. It makes the breakers, switchgear, backup power, prefabricated power modules and cooling that data centers, buildings and plants need, plus factory controllers and industrial software (AVEVA, ETAP and RIB). What it does not do: it does not generate power, make chips, run data centers or train AI models. [S9][S11]
| Product | What it is in everyday words | Who uses it |
|---|---|---|
| Electrical distribution | Breakers and switchgear that route power and cut it off safely [S9] | Buildings, plants, data centers |
| Secure power (UPS) | Batteries and electronics that keep servers running when the grid fails [S1] | Data centers, IT rooms |
| Prefabricated power modules | Electrical rooms built in a factory and shipped to site [S1][S2] | Data-center builders |
| Cooling (Uniflair chillers) | Equipment that removes heat from servers [S1] | Data centers |
| Industrial Automation | Controllers and drives that run machines and plants [S9] | Manufacturers, process plants |
| Software: AVEVA, ETAP, RIB | Software to design, run and monitor plants and power systems [S9] | Engineers, plant operators |
| Customer | What Schneider provides | Value (company-reported) |
|---|---|---|
| Switch (private) | $1.9B supply-capacity agreement: prefabricated power modules and cooling, including the first US Uniflair chillers [S1][S2] | Guaranteed production capacity; its largest North American cooling deal |
| Digital Realty (NYSE: DLR) | $373M agreement: backup power, low-voltage switchgear and prefabricated power skids, with a dedicated switchgear line [S1][S2] | Shorter deployment times |
| Nvidia | Partner: designing cooling for its most powerful chips [S11] | Not quantified |
Contract values are totals over each delivery period. Schneider does not disclose spending by customer.
| Customer type | Product or service | What they get |
|---|---|---|
| Data-center owners | Power distribution, backup power, cooling, prefabricated modules | Much of the facility's electrical and cooling system, with guaranteed factory capacity [S1][S2] |
| Building owners and builders | Breakers, switchgear, building management | Safe, monitored power for the building [S9] |
| Manufacturers and process plants | Automation and AVEVA software | Machines and plants that are controlled and monitored [S9] |
| Utilities and infrastructure | Grid equipment and ETAP software | Equipment and design software for networks [S9] |
| AI chain layer | Schneider's role |
|---|---|
| Chips & hardware | None; partners with Nvidia on cooling [S11] |
| Compute & cloud | Supplier to data-center owners such as Switch and Digital Realty; runs no data centers [S1] |
| Energy & power | Power distribution, backup power and cooling inside data centers [S9][S1] |
| Data | Industrial data software (AVEVA; Cognite once bought) [S6] |
| Foundation models | None |
| Developer tools & infrastructure software | Industrial software: AVEVA, ETAP; PTC pending [S9] |
| Applications | Plant and building operations software [S9] |
| Physical AI | Factory automation (Industrial Automation) [S9] |
| Layer | Schneider's role |
|---|---|
| Power generation | None |
| Grid and medium voltage | Grid equipment and design software [S9] |
| Building and data-center distribution | Breakers, switchgear, backup power, modules [S9][S1] |
| Cooling | Chillers and liquid cooling [S1] |
| Automation and software | Controllers, AVEVA, ETAP, RIB [S9] |
| Company | Where it competes | Ownership |
|---|---|---|
| Eaton, Vertiv | Data-center power and cooling [S12] | Public (NYSE: ETN; NYSE: VRT) |
| ABB, Siemens | Power distribution and switchgear [S13] | Public (SIX: ABBN; XETRA: SIE) |
| Measure | H1 2026 | H1 2025 | FY2025 |
|---|---|---|---|
| Revenue | 21,226 ($23.4B) | 19,336 | 40,152 ($44.3B) |
| Adjusted EBITA (margin) | 4,093 (19.3%) | 3,510 (18.2%) | 7,520 (18.7%) |
| Gross margin | 42.5% | — | — |
| Net income, group share (margin) | 2,488 (11.7%) | 1,913 (9.9%) | 4,163 (10.4%) |
| Adjusted earnings per share | EUR 4.79 | EUR 3.97 | EUR 8.59 |
| Free cash flow | 1,631 ($1.8B) | 474 | 4,635 ($5.1B) |
Sources: [S8][S3]. Net margins are Olympus arithmetic. H1 2025 free cash flow was reduced by a one-time fine in a French legal case. [S8]
| Measure | Figure | Basis |
|---|---|---|
| Q3 2026 revenue | EUR 11.46B ($12.7B); +16.9% organic | [S9] |
| 2026–2030 targets | Organic revenue +7–10% a year; adjusted EBITA margin +2.5 points | [S15] |
| Dividend | EUR 4.20 a share for 2025 | [S3] |
| Buybacks | EUR 600M programme to end-November 2026; EUR 2.5–3.5B through 2030, paused 2027–28 | [S9] |
| Shares | 577.1M in issue (30 Jun 2026); one ADR = one-fifth share | [S16] |
| SBGSY close, 13 Nov 2026 | $53.80 (Paris EUR 243.45) | [S17] |
| Market value | About $155B on shares in issue (estimate); about 28x 2025 adjusted EPS (Olympus arithmetic) | [S16][S17][S3] |
PTC: agreed 5 October 2026 at $205 a share in cash, about $22.6 billion for the equity and $23.7 billion including debt; Schneider targets EUR 250 million of cost savings by year three and about EUR 800 million of extra revenue; closing is expected by the third quarter of 2027, subject to PTC shareholders and regulators. Cognite: agreed 30 June 2026 for $3.1 billion in cash; 2025 revenue above $170 million; to join AVEVA. [S9][S10][S6][S7]
| Level | Risk | What to know |
|---|---|---|
| HIGH | PTC integration | About $23.7B including debt; closing by Q3 2027 needs approvals [S9][S10] |
| MEDIUM | Valuation | About 28x 2025 adjusted earnings per share (Olympus arithmetic) [S3][S17] |
| MEDIUM | Data-center concentration | About 30% of orders; triple-digit growth could slow [S9][S14] |
| MEDIUM | Competition | Eaton and Vertiv in data centers; ABB and Siemens in distribution [S13][S12] |
| Timing | Event | Why it matters |
|---|---|---|
| 18 Feb 2027 | Full-year 2026 results | Against the raised targets [S9] |
| By Q3 2027 | PTC closing | About $23.7B; adds design software [S9][S10] |
| Ongoing | Data-center demand | Triple-digit growth in Q3; the main driver [S9] |
Disclosures. Educational research, not investment advice; Olympus gives no buy or sell ratings or price targets. Conviction is on a I–V scale (I–II Low, III Medium, IV–V High). Olympus uses AI research tools, including Anthropic's Claude, to help gather and check sources; the analysis and rating are George Brust's. Schneider Electric SE is a public company listed on Euronext Paris (SU) with a US ADR (SBGSY); figures come from its releases, filings and press reports as cited. Dollar conversions are Olympus arithmetic.
Each number is tagged to a numbered source — SEC filings, company releases and tier-one press — not recycled headlines.
What the company actually delivers, where it sits in its value chain, who pays — and what is not disclosed.
Where this company sits against incumbents and challengers — moats, risks, and the bear case stated plainly.
A decision-grade PDF you can put in front of an investment committee, client, or board.