Largest U.S. nuclear fleet; 55 GW after Calpine; Nasdaq: CEG. Q3 adjusted EPS $5.06 (from $3.04); 2026 guide raised to $12.50–12.80. 20-year deals with Microsoft, Meta, Google and Amazon; up to $5B DOE uprate loan offer. Updated Nov 9, 2026. 11 pages.
Deeper than Bloomberg. Earlier than Wall Street.
The full Constellation Energy brief is free. Enter your name and email and we'll send your PDF in minutes.
No spam. Unsubscribe anytime.
By George Brust, President & CEO, Olympus Services · Published 9 Nov 2026
The Constellation Energy brief below is the full Olympus research text, with every figure tagged to a numbered source. A formatted PDF of the same brief is free by email.
| Date | Event |
|---|---|
| 7 Jan 2026 | Completes the Calpine purchase; becomes the largest U.S. power producer [S1][S2] |
| 9 Feb 2026 | CyrusOne: 380 MW at Freestone, Texas, plus a 380 MW option — over 1,100 MW in Texas in total [S3][S4] |
| 18 Mar 2026 | Agrees to sell ~4.4 GW of PJM gas plants to LS Power for $5B, as regulators required [S5][S6] |
| 31 Mar 2026 | Sets 2026 guidance at $11.00–12.00 a share and targets 20%+ yearly base EPS growth through 2029 [S7][S8] |
| 23 Jun 2026 | Walmart: ~176 MW from Dresden, Illinois — Walmart's first nuclear contract [S9][S10] |
| 6 Aug 2026 | Q2: raises 2026 guidance to $11.50–12.50; 920 MW of new nuclear contracts; Crane wins FERC waiver and NRC fuel approval [S11][S12] |
| 10 Sep 2026 | Agrees to buy the 609 MW Rhode Island State Energy Center from Shell for $715M [S13][S14] |
| 30 Sep 2026 | Amazon: 20 years, 690 MW from Calvert Cliffs, Maryland, including a ~190 MW uprate [S15][S16] |
| 6 Oct 2026 | Google: 20 years for 890 MW of new capacity at 11 reactors, plus 15 years for 2,700 MW [S17][S18] |
| Oct 2026 | Completes the $860M sale of the 606 MW Brazos Valley plant in Texas to LS Power [S19] |
| 27 Oct 2026 | DOE conditional loan commitment of up to $5B for uprates at eight plants [S20][S21] |
| 9 Nov 2026 | Q3: adjusted EPS $5.06 (from $3.04); 2026 guidance raised to $12.50–12.80; first Peak+ deal, 270 MW for 20 years; shares rise 10.5% [S22][S23][S24] |
This brief is the sixth in our series on the power stack for AI data centers, after GE Vernova, Eaton, Vistra, NRG Energy and Vertiv. Constellation is the largest nuclear generator in the series. This edition updates our 8 November brief for results for the quarter to 30 September 2026, reported on 9 November.
Constellation is headquartered in Baltimore. Joe Dominguez is chair, president and chief executive, and Shane Smith chief financial officer. It owns 55 gigawatts of nuclear, natural gas, geothermal, hydro, wind and solar plants, produces about 10% of America's clean energy, and serves about 2.5 million customer accounts, including 80% of the Fortune 100. [S11][S15][S9]
It bought Calpine on 7 January 2026 for 50 million shares, $4.5 billion in cash and about $12.7 billion of Calpine's net debt — a net price of $26.6 billion. Regulators required it to sell some gas plants: about 4.4 gigawatts in Delaware and Pennsylvania to LS Power for $5 billion, and the 606-megawatt Brazos Valley plant in Texas for $860 million. The Brazos Valley sale closed in October; the LS Power sale is expected to close by year-end. [S11][S2][S25][S26][S5][S19]
For the quarter to 30 September, operating revenues rose to $9.55 billion from $6.57 billion, GAAP earnings to $5.19 a share from $2.97, and adjusted earnings to $5.06 a share from $3.04, with Calpine the main driver. It raised 2026 guidance for the second time, to $12.50–12.80 a share; the low end equals the top of the range set in August. [S22][S27][S23]
In September it agreed to buy the 609-megawatt Rhode Island State Energy Center from Shell for $715 million, and in the quarter it signed the first deal under Peak+, its new product for large customers: 270 megawatts from its nuclear fleet for 20 years, starting in 2028. [S22][S13][S14]
Its long-term contracts now include Microsoft (the Crane restart), Meta (Clinton), Google (890 megawatts of new capacity at 11 reactors and 2,700 megawatts from existing plants), Amazon (690 megawatts from Calvert Cliffs) and Walmart (Dresden). Prices are not disclosed. [S9][S28][S29][S17][S16]
Conviction held at IV (High). Constellation has signed Microsoft, Meta, Google and Amazon to long-term nuclear contracts, and Google and Amazon are paying for new output at plants that already run. Third-quarter earnings beat forecasts and guidance has been raised twice this year. Against that, most of the new contracts start between 2027 and 2032, Crane's grid connection is not settled, and the Calpine purchase added debt. We would lower the rating if Crane slips well past 2027 or grid rules block new data-center contracts.
The AI buyers came for the reactors that already run.
Olympus Services view
What it provides: electricity — from nuclear, natural gas, geothermal, hydro, wind and solar plants — plus capacity (power held ready for the grid), natural gas, and retail energy supply to homes and businesses. For data centers it also offers 'powered land': a site next to one of its plants, with power and a grid connection. What it does not do: it does not make chips or servers, own transmission lines or run data centers. [S30][S15][S3][S9]
| Product | What it is | Who buys it |
|---|---|---|
| Wholesale power and capacity | Electricity and reserve capacity sold into grid markets such as PJM and ERCOT [S30] | Grid operators, utilities |
| Long-term power contracts | 15–20-year agreements for nuclear output, often paying for uprates [S9][S28][S17][S16] | Microsoft, Meta, Google, Amazon, Walmart |
| Powered land | A data-center site beside a plant, with power and grid connection [S3][S4] | CyrusOne |
| Retail energy | Electricity and natural gas supply [S30][S15] | About 2.5 million home and business accounts |
| Customer | Plant | Size | Term |
|---|---|---|---|
| Microsoft | Crane, PA (former Three Mile Island Unit 1), restart targeted 2027 [S28][S31] | ~835 MW | 20 years |
| Meta | Clinton, IL — full output plus a 30 MW uprate [S29][S32] | 1,121 MW | 20 years from June 2027 |
| Uprates at 11 PJM reactors in IL, PA, NJ; first in 2028 [S17][S18] | 890 MW new | 20 years | |
| Supply from existing PJM plants [S17][S18] | 2,700 MW | 15 years | |
| Amazon | Calvert Cliffs, MD — including a ~190 MW uprate in 2030–32 [S15][S16] | 690 MW | 20 years |
| Walmart | Dresden, IL — including a 30 MW uprate [S9][S10] | ~176 MW | Two 15-year terms from 2029–30 |
| CyrusOne | Freestone and Thad Hill, TX — powered land [S3][S4] | >1,100 MW | Not disclosed |
| Not named | Peak+ — energy, capacity and nuclear attributes from the existing fleet [S22][S27] | 270 MW | 20 years from 2028 |
| Customer type | Product or service | What they get |
|---|---|---|
| Hyperscalers | Long-term nuclear contracts | Round-the-clock carbon-free power for 15–20 years, and new capacity added to the grid [S15][S17] |
| Data-center developers | Powered land | A site, power and a grid connection next to a plant [S3][S4] |
| Corporations | Nuclear contracts and retail supply | Energy, clean-energy attributes and capacity [S9][S16] |
| Grid operators | Wholesale energy and capacity | Power and reserves for the grid [S30] |
| Homes and businesses | Retail electricity and gas | Monthly energy supply [S30][S15] |
| AI chain layer | Constellation's role |
|---|---|
| Chips & hardware | None |
| Compute & cloud | None; supplies power to data centers [S15][S3] |
| Energy & power | Generates electricity; long-term nuclear contracts with Microsoft, Meta, Google and Amazon [S15][S28][S17] |
| Data | None |
| Foundation models | None |
| Developer tools & infrastructure software | None; uses Google Cloud and Gemini Enterprise [S18][S33] |
| Applications | None |
| Physical AI | None |
| Company | Where it competes | Ownership |
|---|---|---|
| Vistra | Nuclear and gas generation; Texas retail (Olympus brief) | Public (NYSE: VST) |
| NRG Energy | Texas and PJM generation and retail; data-center contracts (Olympus brief) | Public (NYSE: NRG) |
| Talen Energy | Nuclear power for Amazon: 1,920 MW from Susquehanna through 2042 [S34][S35] | Public (Nasdaq: TLN) |
| Segment | Operating revenues | RNF |
|---|---|---|
| Mid-Atlantic | $5.28B | $2.83B |
| Midwest | $4.86B | $2.76B |
| New York | $1.70B | $1.21B |
| ERCOT (Texas) | $1.41B | $0.84B |
| Other Power Regions | $3.55B | $0.82B |
| Calpine | $7.93B | $4.08B |
Source: [S19]. RNF = revenue net of fuel and purchased power. Segment figures are before intersegment and other items, so they do not add to the consolidated total.
| Measure | Q3 2026 | Q3 2025 |
|---|---|---|
| Operating revenues | $9.55B | $6.57B |
| GAAP net income | $1.84B | $0.93B |
| GAAP EPS | $5.19 | $2.97 |
| Adjusted EPS | $5.06 | $3.04 |
| Nuclear output | 46,677 GWh | 46,477 GWh |
| Nuclear capacity factor | 97.2% | 96.8% |
Sources: [S22][S27]. Capacity factor excludes Salem and South Texas Project.
| Measure | Figure | Basis |
|---|---|---|
| Revenue, first nine months 2026 | $28.18B | [S22] |
| 2026 guidance | Adjusted EPS $12.50–12.80 (raised 9 Nov) | [S22][S23] |
| Long-term target | Base EPS growth of 20%+ a year through 2029; 2029 base EPS $11.40–11.90 | [S8][S39] |
| Capital plan, 2026–27 | $3.9B growth projects; $5B buyback authorization; dividend +10% a year | [S7][S8] |
| Share repurchases, first nine months 2026 | $3.00B ($1.03B in Q3) | [S22][S19] |
| Diluted shares, Q3 average | 354M | [S22] |
| CEG close, 9 Nov 2026 | $276.09 | [S24] |
| Market value | $97.1B (351.6M shares at 31 Oct x close) — about 22x the 2026 guidance midpoint (Olympus arithmetic) | [S24][S19][S22] |
Constellation paid 50 million shares and $4.5 billion in cash and took on about $12.7 billion of Calpine's net debt. After cash Calpine generated before closing and its tax assets, the net price was $26.6 billion, or 7.9 times expected 2026 EBITDA. Constellation forecast the deal would raise 2026 adjusted earnings per share by more than 20% and add more than $2 billion of free cash flow a year. [S25][S26]
| Level | Risk | What to know |
|---|---|---|
| HIGH | Crane grid connection | The Q3 filing gives no restart date; PJM found some required grid upgrades could run as late as December 2030. FERC moved Eddystone's grid rights to Crane in June [S19][S28][S31] |
| MEDIUM | Grid rules for data centers | Contracts depend on PJM and federal rules for serving large new loads [S18][S28] |
| MEDIUM | Debt and integration | Calpine added debt; long-term debt $19.4B plus $4.0B short-term at 30 September [S22] |
| MEDIUM | Contracts start later | Most new contracts begin between 2027 and 2032 [S11][S9][S17] |
| Timing | Event | Why it matters |
|---|---|---|
| By end-2026 | LS Power sale of ~4.4 GW closes | Completes the required Calpine divestitures; Brazos Valley closed in October [S5][S19] |
| 2027 | Crane restart | 835 MW for Microsoft [S11][S28] |
| June 2027 | Meta contract begins at Clinton | First large hyperscaler contract to start [S29][S32] |
| 2028 | First Google uprate | Start of 890 MW of new capacity [S17][S18] |
| Ongoing | DOE loan becomes final | Up to $5B over 30 years at 0.375% over Treasuries; conditions first [S20][S22] |
| Pending approvals | Rhode Island plant purchase closes | Adds 609 MW of gas generation in New England [S13][S14] |
| Feb 2027 (estimate) | Q4 2026 results and 2027 guidance | First full year with Calpine |
Disclosures. Educational research, not investment advice; Olympus gives no buy or sell ratings or price targets. Conviction is on a I–V scale (I–II Low, III Medium, IV–V High). Olympus uses AI research tools, including Anthropic's Claude, to help gather and check sources; the analysis and rating are George Brust's. Constellation Energy is a public company listed on Nasdaq (CEG); figures come from its SEC filings, earnings releases and press reports as cited.
Each number is tagged to a numbered source — SEC filings, company releases and tier-one press — not recycled headlines.
What the company actually delivers, where it sits in its value chain, who pays — and what is not disclosed.
Where this company sits against incumbents and challengers — moats, risks, and the bear case stated plainly.
A decision-grade PDF you can put in front of an investment committee, client, or board.